Back to Other Products

Stöbich Fire & Smoke Curtain S

This vertically deploying textile system follows rectangular or polygonal layouts. It creates a temporary compartment around architectural openings while its housing remains integrated with the ceiling during normal use.

Details that make the difference.

Applications

Architectural openings; atriums and circulation spaces; smoke-control coordination

Configurations

Coordinate polygon geometry, guides, bottom bar, housing, supports, controls and the deployment path. The selected curtain configuration and test basis must match the project fire strategy. Do not infer a UL 1784 smoke-leakage classification solely from the product name.

Technical specifications

The U.S.-designated datasheet V US-20230130 identifies 120 minutes under UL 10D and 20 minutes under UL 10B/10C and NFPA 252. These are different test outcomes, not interchangeable ratings. Verify the current listing, fabric, dimensions and application acceptance for the selected system. Coordinate polygon geometry, guides, bottom bar, housing, supports, controls and the deployment path. The selected curtain configuration and test basis must match the project fire strategy. Do not infer a UL 1784 smoke-leakage classification solely from the product name. INSTALLATION, TESTING & SERVICE Acousti coordinates the opening survey, supporting construction, power, controls and installation/service scope. Complete acceptance testing and commissioning for the selected assembly. Keep closing paths clear and maintain labels and inspection records; inspection, drop testing, reset and maintenance follow applicable requirements and current manufacturer instructions. A manufacturer test or listing does not by itself establish code compliance of the installed opening.

Performance ratings

The U.S.-designated datasheet V US-20230130 identifies 120 minutes under UL 10D and 20 minutes under UL 10B/10C and NFPA 252. These are different test outcomes, not interchangeable ratings. Verify the current listing, fabric, dimensions and application acceptance for the selected system.

Technical documents

Visit Technical Resources